Commuters on the Kapiti train line into Wellington should prepare for delays after a truck hit the rail bridge at Ngauranga.
The vehicle was towing an oversize load when it clipped the bridge just before 5am.
Kiwirail says engineers have now inspected the crossing and a 25km/h speed limit is in place for trains.
SHARE ME